News
The first batch of drilling tools was shipped from the production of "PTС "ERDE TOOLS" for the strategic infrastructure facility of Russia "Power of Siberia"
On July 15, 2016, the first batch of drilling tools was shipped from the production of "PTС "ERDE TOOLS" LLC for the strategic infrastructure facility of Russia "Power of Siberia".